Skip to main content

Gallery Archives - Page 3 of 5 - Zallaf

Galleries

The second meeting of the Management Committee for 2021

Tuesday, 2-2-2021, the second meeting of the Management Committee for 2021 was held in Zallaf Company meeting room, headed by the Chairman of the Management Committee and members of the Management Committee. The agenda of the meeting was to discuss several topics, the most important of which was, the discussion of the N.O.C letter on reduction of the number of employees at the company’s office, as a protective measures for their safety from the spread of Corona virus, and the discussion of the latest developments regarding the Erawin field camp and the land granted in the city of Tmnhant, as well as the discussion of the proposal submitted by Petrofac oil company regarding the surface facilities to be established in the Erawin field, and the preparation of a budget for the Re-entry operations, the follow up of the procedures for some wells in the Alatshan field, and the procedures for drilling the well NC174.

Other proposals were also discussed, including the proposal to form and name a committee for complaints and personnel affairs and the proposal of the Social Solidarity Fund Committee.

The management committee conducting a field visit to the Chadar field

The Chairman of the Management Committee, accompanied by members of the Management Committee and a number of departmental managers and specialists, the Production Department manager and the manager of Reserve, Development Department of the N.O.C arrived into the Chadar field on Sunday, January 31, 2021,the purpose of this visit is to in follow up and determine the progress of re-entry operations to the wells A4 and A2, and the drilling process for the alternative well A1a, and the testing operations for well A2, which was successfully re-entered and retrieved, which minimize the company expenditure of drilling an alternative well

It is worth to mention that the well A2 was drilled in 1968 by Mobil company, and the N.O.C had recently granted this concession to the Zallaf Libya Company for exploration and production of oil and gas for study, development and production.

The drilling operations of the alternative well A1a were also examined by the company’s team in the field, thanks for the tremendous work incorporation with National Drilling Company and Al-Jouf Company and other companies supporting drilling and testing operations in very difficult climate.

the Chader field, which is intended to be linked to the Alfaregh field of the Waha Oil Company in the production phase, in a distance of 40 km, was also visited, as well as the route of the pipeline.

The second Management Committee meeting for 2021

Wednesday, 1-19-2021, The second Management Committee meeting for 2021 was held at the Zallaf Company leaded by Mr. Chairman, Eng. Hussen Abusliana and members of the Management Committee DR. Abdussalam A. Aziz., MMC for Exploration, Development and Production. Eng. Barkuli Elhabib, MMC for Engineering and Projects , and virtually Eng. Abdulhafed Abuaen , MMC  for Operations and Maintenance, and Mr. Ramadan Ebouda , MMC For human resources, services and supplies. The meeting discussed several topics, the most important of which is the implementation of the company’s strategic objectives for the 2021, and the procedures for establishing a camp for Zallaf’s employees in the Erawin field, as well as discussing a mechanism to speed up the construction of the crude transport line between Erawin field and Sharara oil field of Akakus oil operations, in addition to starting the process of registering procedures  of the land granted to the company in the Tmnhent area and fencing it and presenting an architectural proposal to be a location and headquarters for the company. Other topics were also discussed, such as the skills and competency assessment project with Petroskills company, and the working plan for this year.

Handling operations continue at AlKums port

For the seventh day, handling and transferring crude oil pipelines continue from the MV-CLIPPER AEINA vessel ducked at Alkums port to the transit yard of Zallaf Company in the best possible and safest way, this comes as a result of to the commitment of all workers and those in charge of this project by following the recommendations of the CMC to take the highest attention of the company’s safety procedures in transport and handling operations. A team from the departments involved made a field visit to the operations site in order to find out the progress of work and inspect the pipelines status. Dr. Youssef Younes, a senior specialist in corrosion and quality control of projects, informed us that the pipes are in good condition and are examined periodically upon handling,

Mr. Abdunasr AlKbesh, Director of the Materials and Supply Department, said that the operations are going intensively as planned, and will be completed on time, and he also extended his sincere thanks and appreciation to the customs administration of AlKhums Port for their national role and efforts in order to overcome all difficulties.

The official announcement of start of drilling operations in the Erawin field

Wednesday 13 of January 2021, as a result of the great efforts from all departments of the company, Zallaf Libya for Oil and Gas Exploration and Production announces officially the start of drilling operations in the Erawin oil field, which is located in the Murzuq Basin, about 50 kilometers northeast of Alawainat,  using The rig belonging to Fayad Burgan Company contracted through the National Drilling Company.

It is expected that four wells will be drilled as a first stage and tests will be conducted, and then drilling operations will be completed in the field based on the results of these tests.

MV-CLIPPER ARGINA ship arrived to the port of Alkhoms

January 11, 2021, the MV-CLIPPER ship docked at Alkhoms Port, coming from Tianjin Port in China, the cargo of this ship contains crude oil pipelines for Zallaf Libya oil & gas exploration and production, which will be used to transfer crude oil from Erawin field into Sharara field owned by Akakus oil operations. The length of this line extends to About 100 kilometers

The Erawin field is one of the company’s most important fields, and it is located in the Murzuq Basin,

50 km east of Alawainat city.

Among the strategic objectives of the company for this year is to put the Erawin field on production

The CMC, Eng. Hussen Abusliana, holds a meeting with officials from Jowfe Oil Technology Company on the prospect of cooperation

Within the framework of joint cooperation between the national companies owned by N.O.C, a consultative meeting was held today, Monday 11 of January-2021, in the Chairman office, Eng. Hussin Abusliana, with Mr. Suleiman Ajil, a member of the Management Committee for Operations and Maintenance of AJouf Oil Technology , And Mr. Hilal Idris, Director of Operations of Jowfe Company, and Mr. Ashour Issa

The meeting discussed ways and mechanisms of cooperation between Zallaf Libya Oil and Gas Exploration and Production and Jowfe Technology Company, this meeting comes based on the recommendations of N.O.C on exchanging experiences and transferring the knowledge between the national companies.

Engineering team cundacted an expedition trip to inspect the area (NC174)

Under the supervision and coordination of the Exploration Department, a team of Zallf engineers formed from the Exploration Department, the Engineering and Projects Department, the Drilling Department, the Health, Safety and Environment Department, , conducted a field visit to the concession area (NC174) in order to inspect and study the situation in terms of terrain and logistical operations prior the start of the exploration operations in the area. Mohamad Saaud, a geophysical coordinator from the Exploration Department,noted that this trip is a practical exploration trip to inspect the area on the ground, in order to prepare for the exploration activities prepared by the company and to examine the difficulties that may face the operations due to the difficult topography of the area, and its sensitivity, as it is an archaeological area and contains a cultural heritage. Which is requires advanced coordination of the All relevant parties so that our operations are successfully performed without any damages, whether to the environment or to the cultural content that characterizes that region, and it is well known that Zallaf Company and its policies adopted, is to carry out its operations successfully with full responsibility and commitment towards the environment and the surrounding area of its operations.

The agenda of the general assembly meeting of the NOC and Zallaf Libya for exploration & production of oil and gas, Fields development projects, creation of future projects and sustainable development projects for the south region

Quoted from the N.O.C website

The general assembly meetings of the NOC and Zallf,  hosted this year by Sirte Oil and Gas Company in Briqah city ,on Saturday 26,of December 2020, Leaded by Eng. Mustafa Sanallah, Chairman of the NOC.  (Chairman of the General Assembly) with the presence of Mr. Abulqasim Shanqir,Mr. Jadallah Al Awkali, and Al Amari Mohamed, members of the Board of Directors (members of the General Assembly)

Eng. Hussin Abusliana, Chairman of Zallaf’s Management Committee (through the closed circuit),  Eng, Abdulhafed Abuaen ,Eng, Abdussalam A. Aziz ,Eng, Barkuli Elhabib and Mr.Ramadan Ebouda , Members of Zallaf Management commetee, and general directors and advisors on both sides, the Chairman and members of the Monitoring Authority.

The meeting,  reviewed the company’s various activities in health, safety and environment, exploration activities, geological and reservoir studies, drilling wells, and engineering projects during 2020, and the proposed work and budget for the 2021, in addition to the various projects that the company intends to undertake during 2021. The monitoring authority has also presented its report and responded to the observations .

The meeting also discussed the company’s strategic objectives for 2020, including the completion of the Erawin and Chadar field projects and the preparation to start production from those fields, the completion of the feasibility study for the establishment of the South Refinery and the LPG Extraction Unit for domestic use, in addition to plans to develop the Al-Atshan field, to providing gas to  Ubari power plant, and drilling wells in the exploration zone 174.

Eng. Mustafa Sanallah said in his speech: We count on Zallaf, to be an important step in stabilizing the south, creating sustainability and providing the requirements for a better life for our people in the beloved south, through several strategic projects that it will undertake in the future, and will have a major role in developing and increasing Production of oil and gas.

In this regard, he stressed the importance of preparing plans to develop the Alatshan field, the most prominent challenge for the company, which will work to provide Ubari power station with gas supplies, and praised the company’s efforts to complete the implementation of the SAP system, which is a step in the direction of digital transformation and a distinguished work that is calculated for the company, to be able to do the work professionally as the first national company in the oil sector to use this technology.

He noted the good step taken by the company to give the young men and women the opportunity to take over the leadership of some of the company’s departments, as part of the encouragement to prepare leaders from the new generation to assume responsibility.

The members of the Board of Directors emphasized in their comments to the company’s management committee, the need to intensify field visits, support the efforts of their employees, and communicate with national companies such as Al-Jouf Oil Technology and North Africa Geophysical Exploration for collaboration.

In preparation for the start of drilling operations,The CMC, Eng Hussen Abusliana and MMCs arrived to the Erawin field

Tuesday, 22 of December 2020, CMC, Eng. Hussen Abusliana, arrived at the Erawin field in the southwest. Eng, Hussen accompanied by the members of the Management Committee, Mr. Abdussalam  Aziz, Mr. Abdulhafed Abuaen, Mr. Ramadan Ebouda and Mr. Barkuli Elhabib and a number of department managers and specialists, in order to follow-up and stand on preparations fo the start of the drilling operations in the Erawin field  (NC 200). carried out by the drilling rig 50, of the contractor Fayad Burqin company through the National Company for Drilling and Well Maintenance, and also they conducted a visit into the runway, which is expected to be prepared and equipped in the coming days, beside the proposed area for storing the pipeline and drilling equipment.

Also visiting, Al-Owainat office branch to review the maintenance operations and equipment..

On the this occasion The CMC & MMCs have met with a number of delegates from Al-Owainat city who valued this visit and confirmed their keenness and support for the Zallaf Libya and its operations.

Zallaf Libya

Contact info

Sabha (Main) Office
Tripoli Office
Floor 22, Tripoli Tower, Tripoli, Libya
info@zallaf.com
+218 21 3660810 ext. 2000 – 1010

© Copyright Zallaf Co. – All Rights Reserved.